Omni Verifier User’s Manual 363325 Rev.
Packing List (see Figure 1) 1. 2. 3. 4. 5. 6. Omni Verifier Docking Station Universal Power Supply Mounting Hardware (2 screws and 2 wall anchors – shown in Figure 2) Power cord (country specific - sold separately) Deactivation Key (not shown - only available with the Omni Deactivation Package) 363325 Rev.
FIGURE 1 363325 Rev.
Installation of Docking Station Select a location, which is convenient for the operational requirements on a vertical, dry wall and within easy access to an outlet. Mount the docking station at a height, which is comfortable for all intended users. Secure the docking station to the wall with the mounting hardware (screws and wall anchors) provided, in the orientation shown in Figure 2. Connect universal power supply into AC Outlet/Mains and connect the round DC jack into the bottom of the docking station.
Set-Up PLEASE REMOVE CUSTOMER LABEL IF OUTSIDE OF EUROPE! Determine the primary tag frequency type that is used. From this information set the frequency select switches accordingly. Use a small flat blade screwdriver to set the switch position. Figure 3 shows the location of the frequency selector rotary switches. Figure 3 Primary Frequency Table Switch Label Frequency Type (MHz) position A 8.2 (default) B* 7.8, 8.2, 8.6 C 7.8, 8.2 (Europe) D* 8.2, 8.6, 9.0 INVALID POSITION F* 8.2, 8.6, 9.0, 9.5 G 8.2 H 8.
If a secondary tag frequency is required (typically not used), determine the frequency of the secondary tag, then select the following switch setting below. Secondary Frequency Table Switch Label Frequency Type (MHz) position K* 1.8 L* 2.0 M* 2.2 N* 3.25 secondary disabled (default) P* 4.75 Q* 5.0 R* 5.5 S* 16.5 secondary disabled * Frequency can not be used in CEPT member countries within Europe Operation The Omni verifier is used together with the Checkpoint security system.
Controls (refer to Figure 4) OPERATE BUTTON RED button, press to operate; release when finished. MODE SWITCH Slide switch located on the left side of the unit. This allows the user to operate either in the PV (Portable Tag Verifier) or DV (Portable Deactivation Verifier) mode. FREQ. SEL.SWs. Two rotary switches located on the right side of the unit. This allows the user to select which type of tags he/she wishes to detect.
Portable Tag Verification (PV) • Remove the detector from the docking station. • Assure that the mode switch is set to PV. • Depress and hold the red operate button. The green PWR/LO BAT indicator will illuminate, indicating normal PV operation. Assure that the YELLOW mode indicator is not illuminated. • If the green PWR/LO BAT indicator flashes, then place the Omni Verifier back in its docking station. • Slowly bring the Omni verifier toward the tag.
Portable Tag Deactivation (PD) (available only with the Omni Deactivation package) • Remove the detector from the docking station. • Assure that the mode switch is set to PV. • To configure the Omni for Deactivator operation, a special deactivation key card will be needed. (available only with the Omni Deactivation package) • Place the deactivation key card directly under the Omni antenna (see Figure 4), then depress and hold the red operate button.
Maintenance Care of the Omni verifier • Clean the verifier with a soft damp cloth. • Return the verifier to the docking station if the green light flashes while the verifier is in use. • Leave the verifier in the docking station when not in use. • Replace rechargeable battery. • Drop the Omni Verifier. • Clean with solvents. • Clean with abrasive materials. • Leave on or near a room heater. • Immerse in water • Leave in direct sunlight.