. Assemble Mount: see notes 1. Locate Studs: Concrete proceed to step 2 Use 8am. Socket and a Screwdriver, Do Nat Over Tighten Screws M B600x400mm 3. Level Mount and Mark Holes Use Forester Anchors For Oversleep “Brill bit size: Use Smm for wooden studs Use 10mm for concrete 6. Attach Arm Brackets 7. Attach TV to Wall Plate ‘Toggle Bot installation Option: A Pres Holes: This supplied haggle bolts aie poi rod at semitone.