Manual

Installation Instructions LFAU
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
M5 (included)
3/16” (included)
B (2)
[interface upright]
C (1)
[column upper
E (1)
[interface head assembly]
F (1)
[column assembly]
K (5)
5/16-18 x 3/4”
A (4)
[upright cover]
D (1)
[column inner
cover]
cover]
G (1)
[back cover]
L (1)
3/16”
MA (8)
M4x16mm
MB (6)
M4x20mm
MC (6)
M4x25mm
MD (6)
M5x16mm
ME (6)
M5x20mm
MF (6)
M5x25mm
MG (6)
M6x16mm
M (1)
[hardware bag]
MH (6)
M6x25mm
MI (6)
M8x20mm
MJ (6)
M8x30mm
MK (4)
M8x50mm
ML (8)
1/4”
MM (8)
1/2”
MN (8)
[universal]
MP (1)
M5
H (2)
[base plate]
J (8)
5/16-18 x 1/2”
N (10)
[FCA clip]
P (10)
[cable tie]
Q (1)
3/16”