Installation instructions

Installation Instructions RPE
5
Installing to 1-1/2" Threaded Extension Column
NOTE: CPA adapter must be removed prior to installing RPE
to threaded pipe. See CPA Adapter Removal Section
for details.
1. Install 1-1/2" NPT or NPSM steel or aluminum threaded
extension column (not included) into threaded collar until
tight, with a minimum of four threads engaged. (See
Figure 3)
2. Thread RPE projector mount (A) onto the threaded
extension column (not included) until hand tight, with a
minimum of four threads engaged. (See Figure 3)
3. Turn RPE clockwise or counter-clockwise until front of
mount is facing target. (See Figure 3)
IMPORTANT ! : When RPE is properly positioned, the
set screw access hole should be pointing directly at
target, or 180° AWAY from target.
4. Secure RPE to pipe by turning set screw until tight. (See
Figure 3)
CAUTION: DO NOT OVERTIGHTEN! Overtightening of set
screw can damage threads on pipe.
Figure 3
5. Proceed to Installing Projector with Interface Bracket
section.
Installing to Wood Framework (Joists)
1. Using the RPE as a guide, mark four mounting hole
locations. (See Figure 4)
2. Drill four 1/8" x 1-1/2" deep (minimum depth) pilot holes.
(See Figure 4)
Figure 4
3. Align four mounting holes in RPE with four pilot holes.
IMPORTANT ! : When RPE is properly positioned, the
set screw access hole should be pointing directly at
target, or 180° AWAY from target.
4. Secure RPE to structure using four 1/4" x 2" minimum
length lag bolts (not included) and four 1/4" flat washers (not
included). (See Figure 5)
Figure 5
5. Proceed to Installing Projector with Interface Bracket
section.
3
(A)
Threaded extension
column (not included)
x 1
1
2
x 4
1
2
(example only)
4
x 4