INSTALLATION INSTRUCTIONS Universal Interface Suspended Ceiling Projector System SYSAU
SYSAU Installation Instructions DISCLAIMER Milestone AV Technologies and its affiliated corporations and subsidiaries (collectively “Milestone”), intend to make this manual accurate and complete. However, Milestone makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation or use of this product.
Installation Instructions SYSAU DIMENSIONS 415.2 16.35 8.6 .34 129.1 5.08 88.3 3.48 503.5 19.82 MOUNT AND COLUMN ASSEMBLED 79.7 3.14 294.7 11.60 12.7 .50 COLUMN ADJUSTMENT INCREMENT 374.3 14.74 NOTE: 1. THIS IS A 4 SHEET DRAWING 2. SHEET 2 - CEILING PLATE 3. SHEET 3 - PROJECTOR MOUNT AND COLUMN 4. SHEET 4 - UNIVERSAL INTERFACE DIMENSIONS: [MILLIMETERS] INCHES 360 DEGREES OF COLUMN ROTATION REMOVABLE ELECTRICAL INSTALL PLATE 234.2 9.
SYSAU Installation Instructions DIMENSIONS - continued MICRO/MACRO ADJUST KNOB ROLL MICRO ADJUST KNOB 3° ROLL ADJUSTMENT CABLE ROUTING TIE-OFF (4) YAW MICRO/MACRO ADJUST KNOB YAW MICRO ADJUST KNOB 45.1 1.78 177.8 7.00 DIMENSIONS: [MILLIMETERS] INCHES DIMENSIONAL VIEWS OF MOUNT SHOWN WITHOUT COLUMN TO INCREASE CLARITY 348.9 13.73 PROJECTOR LENS DIRECTION ALIGNMENT MARK 157.8 6.21 353.3 13.91 MOUNTING PATTERN LIMITS 153 6.02 ADJUSTABLE FEET 115.7 R4.55 100.2 3.94 115.2 4.53 143.3 5.
Installation Instructions SYSAU LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación Perforar Befestigungsteil lösen Bohrloch Desapertar fixador Fazer furo Allentare il fissaggio Praticare un foro Bevestigin
SYSAU Installation Instructions TOOLS REQUIRED FOR INSTALLATION #2 5/32" (security) [included] PARTS (A) Hardware Bag 9900-002214 [Hardware bag markings match second letter of hardware] AA (4) M2.5x10mm AB (4) M3x10mm AC (4) M4x10mm AF (4) M4x25mm AG (4) M6x25mm AH (4) M5x25mm AK (4) .500x.256x.
Installation Instructions SYSAU ASSEMBLY AND INSTALLATION Attach Universal Interface to Projector WARNING: Exceeding the weight capacity can result in IMPORTANT ! : The longer screws (AF through AI) and spacers (AK) may be used if there is interference between interface legs and any part of the projector, and if more height is required to clear elevated surfaces of the projector.
SYSAU 4. Installation Instructions Place interface legs (Q) over screw adapters (AM). (See Figure 4) 4 (Q) x 3 or 4 8 (AN) x 3 Example: 3 leg attachment Example: 3 leg attachment (P) (AM) x 3 or 4 Sliding mounting screws security holes (4 per leg) Figure 4 5. Ensure that interface leg is firmly seated over screw adapter, and pull out end of interface leg to lock in place over screw adapter. (See Figure 3) 6. Repeat Step 5 for remaining legs. 7.
Installation Instructions SYSAU INSTALLING THE SUSPENDED CEILING PLATE 4. Installing on Top of Existing Ceiling Tile only: Press center tip of ceiling tile cutter (BB) into finished side of ceiling tile at marked location. Cut extension column hole through tile using back and forth motion. 5. Installing on Top of Existing Ceiling Tile only: Reinstall ceiling tile with extension column hole. Ensure tile is oriented for proper location of hole. 6.
SYSAU Installation Instructions 11. Loosen three wing nuts in upper side of ceiling plate assembly (R) to adjust the lateral shift of the column support. (See Figure 10) Installing Support Cable WARNING: Failure to provide adequate structural strength 12. Position column support (as required) to center support over ceiling tile hole.
Installation Instructions SYSAU Wood Ceiling Structure OPTIONAL additional WARNING: Anchors must be installed into wood that measures at least 3-1/2" x 1-1/2" (88.9mm x 38.1mm), and the anchor must install in the center of the narrower (1-1/2" [38.1mm]) face. 1. (R) 3 (BH) x 4 fasteners (BH) Drill 5/32" diameter x 2" deep hole at each marked cable anchor support location (See Figure 13). Remove debris from hole. 610mm (24 in.) 625mm (24-5/8 in.
SYSAU Installation Instructions CAUTION: Failure to properly tension cables (BI) may result in damage to ceiling tile framework! 4. 3. Move projector mount and column upward to desired position. The mount and column will lock into place as soon the column’s upward motion is stopped. 4. If necessary, pull up on the release ring found on the suspended ceiling plate assembly (R) in order to move the column downward.
Installation Instructions 8. Flush with Suspended Ceiling only: Re-install ceiling tile to fit along side(s) of SYSAU. (See Figure 19) SYSAU 3. Slide projector with interface bracket into mounting slots in mount base until thumb nuts are seated in the narrow portion of mounting slots against the opposite side of mounting slots. (See Figure 21) Example: 3 leg attachment EE R SC N 8 Thumb nuts 2 3 Figure 19 Thumb nut 9.
SYSAU Installation Instructions Adjustments ROLL Adjustment NOTE: Be sure to use the correct adjustment feature (Yaw, 5. Turn the ROLL adjustment locking knob (R) counterclockwise (to the left) to UNLOCK (disengage) the drive. 6. Adjust the ROLL freely to the desired macro position, as required. 7. Turn the ROLL adjustment locking knob (R) clockwise (to the right) to LOCK (engage) the drive. 8. Turn ROLL micro-adjustment knob right or left until image is properly aligned on target.
Installation Instructions SYSAU Cable Management 1. Open the cable management cover on the column by opening the side with double raised edge. (See Figure 24) NOTE: The cable management cover may also be slid out of place along the column length. 2. Place cables behind cover and close cover. 3. Cables may be secured using zip-ties (not included) through cable management points on projector mount.
SYSAU Installation Instructions USA/International Europe Chief, a products division of Milestone AV Technologies 8800-002822 Rev01 ¤2016 Milestone AV Technologies www.milestone.com 04/16 Asia Pacific A P F A P F A 6436 City West Parkway, Eden Prairie, MN 55344 800.582.6480 / 952.225.6000 877.894.6918 / 952.894.6918 Franklinstraat 14, 6003 DK Weert, Netherlands +31 (0) 495 580 852 +31 (0) 495 580 845 Office No.