Assembly Instructions
6
Toddler Bed
Figure 7
AB20062_G12
S
M
AA
I
SU
S
AA
N
J
Toddler bed conversion:
Follow assembly instructions up to and including
installation of Base Front Rail Assembly (H) shown
in Step 4.
Spring (O) should be assembled and installed in the
lowest position as shown in Step 5.
If the Long Foot Assembly (B) is in place it must
be removed. Save the hardware and Assembly for
future possible use.
Holes remaining from the Removal of the Long Foot
Assembly (B) must be lled with Connector Nuts (U)
and Allen Bolts (S) to prevent nger entrapment.
Insert Dowel Pins (AA) into top of Foot Posts (I) and
(J). Align Post Cap Left (M) onto Foot Post Left (I)
and press onto Dowel Pins. Insert Allen Head Bolt
(S) through Post cap into Foot post and tighten.
Repeat above procedure with Post Cap Right (N)
onto Foot Post (J).
See gure 7.
Finishing Touches
Place a purchased full sized mattress on the spring.
After completing the crib assembly, and after
making yourself aware of WARNINGS, CAUTIONS,
CLEANING,STORAGE,USE and MAINTENANCE
of crib on pages 8 and 9, store the assembly
directions in the pouch which was pre-attached to
the spring. For future referral to assembly directions
you will only need to remove them from the pouch.
We caution you not to store excess hardware in
pouch as this would be a danger to child if retrieved
by him/her.
AB20062_G11