User's Manual
Table Of Contents
- 1._The_Summary_of_uSat_Flat_Portable_Ter
- 2._Technical_Specification
- OLE_LINK5
- OLE_LINK4
- 3._Packing_List
- 4._The_Description_of_uSat_Flat_Portable
- 4.1_Structure_Diagram
- 4.2_Device_Details
- 5._Operation_steps
- 5.1_APP_User_Manual
- 5.3_Collection_Steps
- OLE_LINK1
- 5.4_Matters_Needing_Attention
- 6._Simple_Fault_and_Maintenance
- 6.1_Troubleshooting
- 6.2_Maintenance
- 7._After-Sales_Service
China Starwin Science & Technology Co., Ltd.
Tel: +8629-88664381, E-mail:
sales@starwincom.com, http://www.starwincom.com
Copyright © 2019 China Starwin
5 Terminal Installation, Initialization and Alignment
5.1 Terminal Installation
5.1.1 Automatic Terminal (FL60P-E) Installation
1. Take the terminal out of the backpack and open four support legs, as shown in Figure 5-1-
1-1 (below).
Figure 5-1-1-1
2. Place the terminal safely on the ground in a horizontal position.
DANGER
If you work on a roof, tower or other high structure or use a ladder or scaffold to access
the work site, follow these precautions to prevent personal injury or death:
• Walk only on sound roof structures.
• Ensure that the antenna assembly and installation surface are structurally sound so
that they can support all loads (equipment weight, ice, and wind).
• Use safety equipment (for example, a lifeline) appropriate for the work location.
• Follow all manufacturer safety precautions for all safety and other equipment used.
• Perform as many procedures as possible on the ground.
DANGER