User's Manual
Table Of Contents
- 1._The_Summary_of_uSat_Flat_Portable_Ter
- 2._Technical_Specification
- OLE_LINK5
- OLE_LINK4
- 3._Packing_List
- 4._The_Description_of_uSat_Flat_Portable
- 4.1_Structure_Diagram
- 4.2_Device_Details
- 5._Operation_steps
- 5.1_APP_User_Manual
- 5.3_Collection_Steps
- OLE_LINK1
- 5.4_Matters_Needing_Attention
- 6._Simple_Fault_and_Maintenance
- 6.1_Troubleshooting
- 6.2_Maintenance
- 7._After-Sales_Service
China Starwin Science & Technology Co., Ltd.
Tel: +8629-88664381, E-mail:
sales@starwincom.com, http://www.starwincom.com
Copyright © 2019 China Starwin
Figure 5-1-2-3 Interface of power supply
NOTICE
Direction to the satellite must be clean from obstacles during the terminal operation.
5.2 Terminal Initialization
1. Connect the Power cable to the Power Source. Upon connection, to the power source, the
display will show the company logo (Figure 5-2-1).
Figure 5-2-1 Logo
DANGER
The standard requirements to Power Source are 100-240VAC 50/60Hz. (Or 24V + 5%
DC, according to configuration for selection)
3. Press the “POWER ON/OFF” button. The display indicates current activity, using
abbreviated text messages - see below for possible displays (Table 5-2-1). In addition,
abbreviated text messages, representing the current terminal actions, are also displayed -
as shown in Figure 5-6.