Technical data
4.8. Initial start-up
ATTENTION! Prior to start-up, make sure that the freeze dryer has
been properly set up and installed (see section 4.1 “Site of
installation” and the following points).
4.8.1. Functional components and control elements
Aeration valve
Drying chamber
Ø300
Mains cable
Mains fuse
Power supply connection
of pressure control valve
and stop valve
Vacuum pump power supply
connection
Serial interface
Vacuum connection Name
p
late
Mains switch
Equipotential bonding screw for
protective ground wire check and
central ground connection
Additional interface
connection
(option, sep. accessory)
Control s
y
stem LSC
Ice condenser
Heat exchanger of refrigeration unit
Ice condenser chamber
28 • Installation and Commissioning of the Unit Operating Manual Freeze Dryer ALPHA 1-4 LSC / ALPHA 2-4 LSC










