Instructions

Table Of Contents
26
MYeBOX 150 - MYeBOX 1500
Instruction Manual
3�8�7� - SINGLE-PHASE NETWORK MEASUREMENT, PHASE TO PHASE, WITH A 2-WIRE
CONNECTION, MYeBOX 150 AND MYeBOX 1500�
Type of installation (Select circuit)
(9)
: 2 Phases.
POWER SUPPLY
ALIMENTACIÓN AUXILIAR
U1
L1
L2
U2 I1
CARGA / LOAD
eBOX 150
MY
Figure 20: Single-phase measurement, phase to neutral, with a 2-wire connection (MYeBOX 150, MYeBOX 1500)�
Note: See section 3.8.10.- DETAIL OF THE CURRENT MEASUREMENT CONNECTION.”
(9)
See 5.2.- DISPLAY MENU: DEVICE PROFILE