User's Manual
Table Of Contents
- 1 About this Guide
- 2 Safety Instructions
- 3 Unpacking
- 4 Overview
- 5 Configuring the Bridge for the First Time
- Before You Start
- Resetting the Bridge to Default Settings
- Obtaining and Assigning an IP Address
- Connecting to the Bridge Locally
- Assigning Basic Settings
- Default Settings on the Express Setup Page
- What To Do Next
- Output Power Level
- Protecting Your Wireless LAN
- Assigning an IP Address Using the CLI
- Using a Telnet Session to Access the CLI
- 6 Mounting the Bridge
- 7 Troubleshooting
- 8 Declarations of Conformity and Regulatory Information
- Manufacturers Federal Communication Commission Declaration of Conformity Statement
- Industry Canada
- Canadian Compliance Statement
- European Community, Switzerland, Norway, Iceland, and Liechtenstein
- Declaration of Conformity with Regard to the R&TTE Directive 1999/5/EC
- Declaration of Conformity for RF Exposure
- Declaration of Conformity Statements
- 9 Bridge Specifications
28
THIRD FCC DRAFT (CISCO CONFIDENTIAL)
Ta b l e 8 Power Injector LED Indications
Uplink Activity Injector Status Ethernet Activity Description
— — Off Wired LAN Ethernet link is not active.
— — Green Wired LAN Ethernet link is operational.
— — Blinking Green Transmitting and receiving packets over the
wired
LAN Ethernet link.
— — Amber Power injector internal memory
error—disconnect and reconnect the power
injector pow
er plug. If the problem continues,
contact technical support for assistance.
Off — — Link between power injector and bridge is not
acti
ve. This might be caused by improper
connections or a defective cable or connector.
Verify that the dual-coax cables are connected
correctly to the power injector, grounding
block, and bridge. If the cables are connected
correctly, contact technical support for
assistance.
Green — — Link between power injector and bridge is
opera
tional.
Blinking Green — — Transmitting and receiving Ethernet packets
between the power injector and the bridge.
Amber — — Power injector internal memory
error—disconnect and reconnect the power
injector pow
er plug. If the problem continues,
contact technical support for assistance.
— Green — Bridge successfully passed Power On Self Test
(POST)
and loaded the IOS image.
— Blinking Green — Bridge power is active and the bridge is loading
IOS image
or POST operation has started.










