User Manual

Table Of Contents
REVIEW DRAFT
2-49
Cisco Aironet 1530 Series Outdoor Access Point Hardware Installation Guide
OL-30864-01
Chapter 2 Installing the Access Point
Powering the Access Point
Step 3 When using the streetlight power tap adapter (AIR-PWR-ST-LT-R3P=), ensure that the access point is
mounted within 3 feet (1 m) of the outdoor light control.
Step 4 Ensure that a 6-AWG ground wire is attached to the access point (see Figure 2-32) and connected to the
streetlight pole (for instructions see Grounding the Access Point, page 2-38).
Figure 2-32 Using the Streetlight Power Tap Adapter
Step 5 Ensure that the streetlight power tap adapter, which uses a 3-pronged LC-10 twist-lock adapter, is placed
between the outdoor light control and its fixture (refer to Figure 2-32). The LC-10 twist-lock adapter is
designed to be used with LC-10 listed outdoor light controls operating at 100 to 480 VAC, 50 to 60 Hz.
Step 6 Disconnect the outdoor light control from its fixture.
Step 7 Verify that the voltage available at the fixture is between 100 and 480 VAC, 50 to 60 Hz.
Step 8 Turn off power to the fixture at the designated circuits.
Caution When installing the streetlight power tap adapter to the access point AC power connector, always
connect the access point end of the cable FIRST. When removing the streetlight power tap adapter,
always disconnect the access point end of the cable LAST.
Note Ensure that your antennas are connected to the access point before you apply power to the access
point.
Step 9 Connect the streetlight power tap adapter to the access point AC/DC power adapter. Hand-tighten the
connector.
1 Outdoor light control 3 6-AWG copper grounding wire
2 Streetlight power tap adapter
351962
1
2
3
This image will be
updated in the next draft