User's Guide

Table Of Contents
6
Note Use only with listed Information Technology Equipment (ITE) equipment. For more
information on ITE equipment, refer to article 645 of the latest National Electrical Code
(NEC).
4 Unpacking the AP
To unpack the access point, follow these steps:
Step 1 Unpack and remove the access point and the mounting accessories, from the shipping box.
Step 2 Re
turn any packing material to the shipping container and save it for future use.
Step 3 V
erify that you have received the items listed below. If any item is missing or damaged, contact
your Cisco representative or reseller for instructions.
The access point.
Cisco local power supply kit, with the AIR-PWR-D power adapter and power cord.
The AIR-PWR-D power supply kit, containing the power adapter and the power cord can be also be
separately ordered from Cisco.