Installation & Configuration Guide

3-25
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
OL-11495-01
Chapter 3 Installing the Router
Attaching the Vertical Cable-Management Trough
Attaching the Vertical Cable-Management Trough
Refer to Figure 3-15 and use the following procedure to attach the vertical
cable-management trough.
Step 1 Position the trough so that the access gate opens toward the front of the chassis.
Step 2 Align the top screw holes on the inside panel of the trough with the chassis
standoffs.
Step 3 Hand tighten two screws into the holes to hold the trough in place.
Step 4 Repeat Step 2 and Step 3 for the middle two standoffs and the bottom two
standoffs.
Step 5 Tighten all six screws with a Phillips screwdriver to secure the trough to the
chassis.