User Manual Part 6

Navini Networks, Inc. Ripwave Base Station I&C Guide
94
the fields in the EMS. NOTE: The Power Splitter Loss was entered when you
performed the RFS configuration earlier.
Step 5. Click on the BTS that is being installed to select it. Right-click on the highlighted BTS
and select Action > Configure. Refer to Figure 51.
Figure 51: Select BTS
Step 6. Click on Air Interface > Layer 1, and then click Calibrate. In the resulting dialog box
(Figure 52), select FULL CALIBRATION and Calibrate.
Figure 52: Calibrate BTS
Step 7. When the Warning window appears (Figure 53), click Yes.