User Manual Part 9

Navini Networks, Inc. Ripwave Base Station I&C Guide
155
Appendix V: IC Closeout Tool
Overview
This is a new complex form that replaces the following older forms:
1. RFS System Test Form
2. 2
nd
tab of the Base Station Installation Certification Form (Serial Numbers)
3. Calibration Verification Form
4. Drive Study Form
5. Location (FTP) Test Form
The I&C Closeout Tool (Part Number xx) consists of the following worksheets (tabs):
1. Company Info
2. BTS Info
3. Serial #
4. Layer 1 & 2
5. Cable Loss
6. Calibration Plot
7. RFS and Cable RFS Loss
8. RF Verification
9. Drive Test Form
10. Location Testing
Before Using the Form
Once a BTS has been added and fully configured in the EMS (including execution the RFS script
from the floppy delivered with the antenna, as well as successfully calibrated, you must perform
the “Export All BTS Data” action on this BTS. This creates a text-only file that will be used as
input for the I&C Closeout Tool.
Using the Form
Open the IC_Form and select the first tab (Company Info) and click on the “Read BTS Export
File (*.txt)” button. This action will read the configuration data contained in the BTS export file
and populate most of the fields in all the tabs of the I&C Closeout Tool. Complete tabs 1