Installation Manual Part 3
PRELIMINARY
6-23
BWX 8415 Basestation Installation and Commissioning Guide
OL-19519-01
Chapter 6 Installation
6.5 Fiber-Optic Cabling
Figure 6-22 Power Cable Leads Installed
6.5 Fiber-Optic Cabling
Warning
Class 1 Laser product.
Statement 1008
General fiber cable information was covered in Chapter 5, “Pre-installation.” Please refer to
5.8 Fiber-optic Cable Selection and 5.11 Confirm AAA, BWG, and Backhaul Network Availability for
information about the required fiber-optic cable and the backhaul connectivity.
To connect a fiber-optic cable to the access point, follow these steps:
Step 1 Ensure that the power source has been disconnected from the BS.
Step 2 Attach the Amphenol connector on the fiber-optic cable to the fiber-optic port on the BS and hand
tighten.
6.6 Complete the BWX 8415 Installation
6.6.1 Install the I/O cable Cover
Perform the following steps to install the I/O cable cover.
Step 1 Install the I/O cable cover over the power, ground, fiber-optic, and GPS cable connections on the BWX
8415. Refer to
Figure 6-23.










