Installation Manual Part 3
PRELIMINARY
6-24
BWX 8415 Basestation Installation and Commissioning Guide
OL-19519-01
Chapter 6 Installation
6.6.2 Test the Backhaul Connection
Figure 6-23 I/O Cable Cover
Step 2 Tighten the screws on the I/O cover securely to prevent water from leaking into the unit.
6.6.2 Test the Backhaul Connection
If required in the Responsibility Assignment Matrix (RAM) or project plan, test the backhaul to the
customer demarcation point.










