User's Manual
Table Of Contents
Navini Networks, Inc. Ripwave Base Station I&C Guide
30
Phase III: Commissioning
1 - Review the customer’s network plans - i.e.,
ATM vs Ethernet backhaul.
3b - Install & configure the customer EMS
Server & Client.
5 - Enter the RFS configuration by running the
RFS script that shipped with the antenna
equipment.
2 - Are you using
the customer’s
EMS Server?
No
Yes
3a - Install & configure the
Test EMS Server & Client.
Appendix P:
Excel Configuration
Form
6 - Verify that all cables are connected.
7 - Power up the BTS & reconfigure the basic
Boot Line parameters through the serial port
on the CC card.
8 - After the BTS has been powered up at least
20 minutes.
A
4 - Install & configure the BTS in the EMS










