User's Manual
Table Of Contents
Navini Networks, Inc. Ripwave Base Station I&C Guide
34
Phase III: Commissioning, continued
D
Appendix U:
Site Installation
Closeout
Documentation
Appendix V:
I&C Closeout form
26b- Verify system operation with multiple
Modems in use.
27 - Back up the EMS database.
28 - Gather all required documents & forms to
create a delivery package for the Customer sign-
off and for the Navini Techical Support database.
See Installation Closeout Documentation.
29 - Participate in the Customer sign-off of the
Customer Acceptance Form.
Appendix W:
Customer
Acce
p
tance For
m










