User's Manual

Navini Networks, Inc. Ripwave Base Station I&C Guide
23
Procedural Documents & Forms
You will refer to other Ripwave documents, procedures, and forms in the process of installing
and commissioning the Base Station. The product documentation is provided on the Ripwave
Standard Documentation CD (Table 1). As well, the EMS manuals can be viewed on-line
through the EMS Server and Client applications.
Table 1: Ripwave Standard Documentation CD
Order Number 95-00116-00 Part Number
EMS Overview Manual 40-00016-03
EMS Software Installation Guide 40-00017-00
EMS-OSS Integration Guide 40-00147-00
EMS Administration Guide 40-00031-00
Ripwave Configuration Guide 40-00016-01
Excel Configuration Form 44-00032-01
EMS CLI Reference Manual 40-00016-02
Ripwave Alarm Resolution Reference Manual 40-00033-00
System Operations, Maintenance & Troubleshooting Guide* 00-00046-00
EMS Diagnostic Tools Guide 40-00032-00
Ripwave Modem Quick Installation Guide 40-00112-00
English 40-00098-00
Spanish 40-00096-00
Ripwave Modem User Guide 40-00111-00
English 40-00097-00
Spanish 40-00099-00
Ripwave Modem Software Update Tool Quick Guide 40-00066-00
Customer Release Notes Varies w/each release
*Available 2Q04
A number of other forms are used in the installation and commissioning process. This I&C
Guide references those throughout, and provides copies in the appendices.
High-level I&C Process
To put the I&C activities in the context of overall system deployment, Figure 4 provides a ‘flow’
of the key activities that are performed prior to and during the installation and commissioning of
the Ripwave Base Station. Post-I&C, the system that has been installed and commissioned goes
through Acceptance Testing against the customer’s objectives for that site. Once customer sign-
off on the site is achieved, the customer becomes fully responsible for operating the system. You
may find this flowchart can be used as a helpful checklist during the process.