Figure 4: High Level I&C Process Flowchart
Phase I: Pre-installation - Site Selection, Design & Preparation
1 - Complete the Project Plan for this
deployment. <Program or Project Manager>
2 - Generate a coverage prediction map.
<RF Engineer>
3 - Conduct a site survey, filling out the Site
Candidate Evaluation Form.
4 – If this is a 2.4 GHz system, complete the
Interference Analysis, following the
Interference Sweep Procedure.
5 - Acquire information about the final site
selected by the customer. Physical site design
completed.