User's Manual
Table Of Contents
Navini Networks, Inc. Ripwave Base Station I&C Guide
26
Phase I: Pre-installation - Site Selection, Design & Preparation, continued
6 - Complete the Network Architecture design.
<Network Planning>
8 - Develop a Bill of Materials (BoM).
<Customer >
9 - Acquire the materials. <Customer>
10 - Confirm the customer backhaul, EMS
Server, FTP Server, input power and
grounding are installed and operational at site.
Appendix I:
Sample BoM
7 - Antenna Power & Cable selection
p
rocedure.
A
Appendix H:
Antenna Power & Cable
Selection Procedure &
Form










