Network Router User Manual

2-11
Cisco 7609 Internet Router Installation Guide
OL-5079-04
Chapter 2 Preparing for Installation
Site Preparation Checklist
DC-Powered Systems
Basic guidelines include the following:
Each chassis power supply should have its own dedicated input power source.
The circuit must be protected by a dedicated two-pole circuit breaker. The
circuit breaker should be sized according to the power supply input rating and
local or national code requirements.
The circuit breaker is considered the disconnect device and should be easily
accessible.
The power supply ground should connect to protective earth ground even
though the system ground connection is provided.
The DC return is to remain isolated from the system frame and chassis
(DC-I).
Site Preparation Checklist
Table 2-6 lists the site planning activities that you should perform prior to
installing the Cisco 7609 Internet Router. Completing each activity helps ensure
a successful switch installation.
Table 2-5 AC-Input Power Cord Options
Locale Description Product Number
2500W Power Supply (WS-CAC-2500W=)
North America
(nonlocking)
12 AWG, 16A/250V CAB-AC-2500W-US1=
North America
(locking)
12 AWG, 16A/250V CAB-AC-C6K-TWLK=
Europe 2.5 mm, 16A/250V CAB-AC-2500W-EU=
International 2.5 mm, 16A/250V CAB-AC-2500W-INT=