Switch User Manual
Send documentation comments to mdsfeedback-doc@cisco.com.
D-3
Cisco MDS 9216 Switch Hardware Installation Guide
78-16165-01
Appendix D Site Planning and Maintenance Records
Site Preparation Checklist
5 Cable and interface equipment
evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
6EMI
3
evaluation:
• Distance limitations for signaling
• Site wiring
• RFI
4
levels
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
3. EMI = electromagnetic interference
4. RFI = radio frequency interference.
Table D-1 Site Planning Checklist (continued)
Task No. Planning Activity Verified By Time Date