User's Manual
Table Of Contents
- Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
- Contents
- Preface
- Introduction
- Preparing to Install the Router
- Installing the Router
- Mounting Kits Overview
- General Safety Information for Mounting
- Contents of the Mounting Kits
- Customer-Supplied Materials and Tools
- Router-Mounting Instructions
- Connecting the Chassis Ground and Power
- Opening the Router Chassis
- Power Connection Compliance
- Connecting the DC Power Cable to the Router
- AC Power Cable
- Connecting the AC Power Cable to the Router
- Connecting Cables
- Antenna Installation and Replacement
- Powering on the Router
- Enabling Zero Touch Provisioning on the Router
- Using CLIs for Flash Memory and Directory Procedures
- What to Do After Installing the Hardware
- Troubleshooting
- Specifications and Part Numbers
- Cable Specifications
- Site Log
The tool in the Strap Tool Kit is manufactured and supported by BAND-IT. For more information about
the tool, see www.band-it-idex.com.
Note
Figure 12: Band Strap Kit Contents
DescriptionItem
Strap tool1
Strap tool documentation (not shown)2
Customer-Supplied Materials and Tools
You must supply some or all of these items to mount the router onto a pole or wall. The items you supply
depends on the installation procedure that you use.
Required for These ProceduresItem
Assembling the Pole Clamp Bracket and the Pole Clamp
Gusset, on page 30
13-mm box-end wrench or socket set
Assembling the Pole Clamp Bracket and the Pole Clamp
Gusset, on page 30
M8 x 12 screws and M8 spring washers
Mounting the Router onto a Wall, on page 40Drill and drill bit
Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
OL-29732-01 29
Installing the Router
Customer-Supplied Materials and Tools
REVIEW DRAFT - CISCO CONFIDENTIAL










