User's Manual
Table Of Contents
- Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
- Contents
- Preface
- Introduction
- Preparing to Install the Router
- Installing the Router
- Mounting Kits Overview
- General Safety Information for Mounting
- Contents of the Mounting Kits
- Customer-Supplied Materials and Tools
- Router-Mounting Instructions
- Connecting the Chassis Ground and Power
- Opening the Router Chassis
- Power Connection Compliance
- Connecting the DC Power Cable to the Router
- AC Power Cable
- Connecting the AC Power Cable to the Router
- Connecting Cables
- Antenna Installation and Replacement
- Powering on the Router
- Enabling Zero Touch Provisioning on the Router
- Using CLIs for Flash Memory and Directory Procedures
- What to Do After Installing the Hardware
- Troubleshooting
- Specifications and Part Numbers
- Cable Specifications
- Site Log
you are using to mount the router. The following figure illustrates the pole diameter indicators and bolt holes
on the pole clamp.
Figure 13: Pole Clamp Bracket Adjustment Hole Locations
Bolt holes for pole diameters (11 to 16 inches
indicated)
2Pole size indicators
•
2 to 6 in.
•
6 to 11 in.
•
11 to 16 in.
1
Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
OL-29732-01 31
Installing the Router
Assembling the Pole Clamp Bracket and the Pole Clamp Gusset
REVIEW DRAFT - CISCO CONFIDENTIAL










