User's Manual
Table Of Contents
- Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
- Contents
- Preface
- Introduction
- Preparing to Install the Router
- Installing the Router
- Mounting Kits Overview
- General Safety Information for Mounting
- Contents of the Mounting Kits
- Customer-Supplied Materials and Tools
- Router-Mounting Instructions
- Connecting the Chassis Ground and Power
- Opening the Router Chassis
- Power Connection Compliance
- Connecting the DC Power Cable to the Router
- AC Power Cable
- Connecting the AC Power Cable to the Router
- Connecting Cables
- Antenna Installation and Replacement
- Powering on the Router
- Enabling Zero Touch Provisioning on the Router
- Using CLIs for Flash Memory and Directory Procedures
- What to Do After Installing the Hardware
- Troubleshooting
- Specifications and Part Numbers
- Cable Specifications
- Site Log
following figure) to provide maximum holding strength for extreme environments. Following the instructions
provided with the banding strap tool (BAND IT) (AIR-BAND-INST-TL=), loop each metal strap twice.
Figure 16: Metal Strap Open Space for 3.5 in. (8.9 cm) and Smaller Poles
Metal strap open space1
Do not place the metal straps in the large open area between the pole clamp bracket and the pole
clamp gussets because this does not properly secure the router.
Caution
Step 4
Position the pole clamp bracket on the pole as needed before tightening the metal bands.
Position the pole clamp bracket on the pole as needed before tightening the metal bands.Note
Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
OL-29732-01 35
Installing the Router
Mounting the Router onto a Pole
REVIEW DRAFT - CISCO CONFIDENTIAL










