User's Manual
Table Of Contents
- Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
- Contents
- Preface
- Introduction
- Preparing to Install the Router
- Installing the Router
- Mounting Kits Overview
- General Safety Information for Mounting
- Contents of the Mounting Kits
- Customer-Supplied Materials and Tools
- Router-Mounting Instructions
- Connecting the Chassis Ground and Power
- Opening the Router Chassis
- Power Connection Compliance
- Connecting the DC Power Cable to the Router
- AC Power Cable
- Connecting the AC Power Cable to the Router
- Connecting Cables
- Antenna Installation and Replacement
- Powering on the Router
- Enabling Zero Touch Provisioning on the Router
- Using CLIs for Flash Memory and Directory Procedures
- What to Do After Installing the Hardware
- Troubleshooting
- Specifications and Part Numbers
- Cable Specifications
- Site Log
We recommend that you loosen and tighten the door bolts in the order as shown in the following figure.
Figure 27: Recommended Order of Loosening and Tightening Bolts
The chassis door features an environmental seal that protects the chassis against environmental elements when
the door is closed. This seal creates pressure, which can cause the door to open suddenly when the last bolt
is loosened.
Before You Begin
You must provide a 1/2-inch (13 mm) socket wrench to open and close the router chassis door.
Cisco ASR 901S Series Aggregation Services Router Hardware Installation Guide
48 OL-29732-01
Installing the Router
Opening the Router Door
REVIEW DRAFT - CISCO CONFIDENTIAL










