User's Manual
Ripwave Base Station I&C Guide Navini Networks, Inc.
196 Part #40-00047-00 Rev D v1.0
February 28, 2003
This Customer Acceptance Form is subject to and governed by all of the terms and conditions set
forth in the Master Supply Agreement between the parties. The Customer acknowledges,
understands and agrees that when it’s Authorized Representative signs-off the Test Acceptance
Section of this Form, Customer has thoroughly inspected the installation and commissioning
services, and Customer’s sign-off means that completion of on-site verification that the
Equipment installed by Seller performs in accordance with the Acceptance Criteria set forth in
the Master Supply Agreement between the parties. The completed Navini Networks’ Site
Installation and Commissioning Documents referenced below and attached hereto are
incorporated by reference into this Customer Acceptance Form for all purposes.
Navini Networks Site Installation and Commissioning Documents (double-click on the box to
check or de-select a checkmark when completing the form):
Site Candidate Evaluation Report
Site Materials BoM
Site Drawings
Site Construction Specific Tests, as required – Grounding System Test Results, Concrete
Break Test Results, Tower Guy Tensioning Test Results, etc.
Site Specific Digital Photographs, as Required
RFS System Tests
Base Station Installation Certification
Base Station Calibration Verification
Location (FTP) Tests
Drive Studies
Coverage Predictions Maps
Soft Copies of Test Results, if Requested