User's Manual

Navini Networks, Inc. Ripwave Base Station I&C Guide
Part #40-00047-00 Rev D v1.0 239
February 28, 2003
Item #
Task / Activity Navini Client Other Notes
7 Tower Structural Analysis 1
8 Contractor Qualifications and Selection 1
9 Contractor walk through 1
10 Obtain / Review bids / Award contract 1
11 Obtain Building permits or other approvals 1
LOGISTICS / SHIPPING / DELIVERY
1 Create Logistics Plan 2 1
2 Ship Navini supplied Equipment to designated
warehouse
1
3 Deliver Equipment to Specific Sites 1
4 Disposal of Shipping materials 2 1
CONSTRUCTION / INSTALLATION
1 Antenna Mounts / brackets S, I
2 Antennas (Navini RFS)
S I
Navini will assist and
supervise installation
from the ground.
3 Coax Cable / Connectors S, I
4 Power / Signal Cable / Connectors (BTS to
RFS)
S I 1 per BTS.
5 Ground Kits S, I
6 Surge protectors/Ground Buss Bars
S, I
Navini to supply surge
protector for the power
and data cable. Client to
supply surge protectors
for coaxial feedlines.
7 GPS 4-Way Splitters for multiple BTS’ installed
at one site. S, I
2 4-Way Splitters
needed for 3-sector
installation.
8 BTS Equipment Racks / Enclosures
S, I
Need to confirm indoor
installation. Enclosure
not required indoors.