User's Manual

Ripwave Base Station I&C Guide Navini Networks, Inc.
242 Part #40-00047-00 Rev D v1.0
February 28, 2003
Item #
Task / Activity Navini Client Other Notes
12 DHCP Server: configure / test 1
13 EMS Client: Configure / Test 1 2
14 Configure monitoring for routers 1
TESTING
1 Determine Network Test Criteria
2 1
Based on trial
agreement.
2 Determine RF Test Criteria
1 1
Based on trial
agreement.
3 Generate Acceptance Test Plan (ATP) 1 1
4 Review Test Plan 1 1
5 Supply Test Equipment
HP/Agilent E4402B Spectrum Analyzer with
Floppy Storage Option, HP/Agilent 8648C RF
Signal Generator, Tektronix TDS 3012B Scope
1 2
Some tests will utilize
built in test capability.
6 Execute Trial Test Plan and capture data 2 1
7 Provide Vehicle and Driver for System Drive
Testing
1
8 Analyze test data and write report 2 1
9 Review Report, Trial test results 1 1
END USER ENGAGEMENT
1 Prepare End User profile 1
2 Develop User Procedures 1
3 Recruit and Sign Up Users 1
4 Distribute CPE kits 1
5 Develop User Surveys 1
6 Survey Users, collect data 1
7 Issue reports 1
SUPPORT & SERVICES