User's Manual
Navini Networks, Inc. Ripwave Base Station I&C Guide
Part #40-00047-00 Rev D v1.0 115
February 28, 2003
Over-the-air CPE Test
Equipment Required
Same as for Wired CPE Test.
Equipment Settings
Included in the Test Procedure.
Test Procedure
To set up a CPE for local over-the-air testing, follow the steps below.
Step 1. Connect a CPE to a test computer. Reference the Ripwave CPE User Guide, P/N 40-
00026-00 for CPE setup procedures. The location of the test computer setup needs to
be close to the Base Station, within its coverage range.
Step 2. Ensure that the CPE is registered in the EMS. Refer to
EMS Configuration & Alarm
Manager (CAM) User Guide, P/N 40-00016-00, for CPE registration procedures.
Step 3. Using FTP software, transfer a 2 Mb file over-the-air from the test computer to the
BTS. This is a system uplink transfer.
Step 4. Using FTP software, transfer a 10 Mb file over-the-air from the BTS to the test
computer. This is a system downlink transfer.
Step 5. Ensure that both files transferred during testing.