Figure 2: I&C Process Flowchart, cont’d.
Click here to link to Appendix D.
16-If required in Responsibility Assignment
Matrix (RAM), test the backhaul to the
customer demarcation point.
15-Record serial numbers & version
numbers of digital & PA cards on the Base
Station Installation Certification Form.
14-Verify digital cards & PA cards are
installed & seated properly.
12-Install RFS & surge protectors.
Connect 9 RF cables & data/power
cable to the RFS.
13-Sweep installed RFS & cables to verify
connections & cable loss. Record results on
RFS System Test Form.
11-Sweep the RFS. Record the results
and the RFS serial numbers on the RFS
System Test Form.
A
B
Appendix D:
Base Station
Installation
Certification
Form
9-Install & verify DC
input power source to BTS
10-Install GPS antennas
16-If required in Responsibility Assignment
Matrix (RAM), test the backhaul to the
customer demarcation point.
15-Record serial numbers & version
numbers of digital & PA cards on the Base
Station Installation Certification Form.
14-Verify digital cards & PA cards are
installed & seated properly.
12-Install RFS & surge protectors.
Connect 9 RF cables & data/power
cable to the RFS.
13-Sweep installed RFS & cables to verify
connections & cable loss. Record results on
RFS System Test Form.
11-Sweep the RFS. Record the results
and the RFS serial numbers on the RFS
System Test Form.
A
B
Appendix D:
Base Station
Installation
Certification
Form
9-Install & verify DC
input power source to BTS
10-Install GPS antennas