User's Manual
Navini Networks, Inc. Ripwave Base Station I&C Guide
Part #40-00047-00 Rev D v1.0 27
February 28, 2003
Figure 2: I&C Process Flowchart, cont’d.
Click here to link to Appendix G.
Click here to link to Appendix H
.
22-Send all preliminary test results
to Navini Technical Support
for evaluation.
24a-Adjust RF parameters &
troubleshoot. Go back to
Step 17, Perform calibration.
No
Yes
19*-Validate that the GPS & constellation
debugger are installed & operational on
the Drive Study computer. Perform
preliminary Drive Study. Record results
on the
Drive Study Form.
23-Results
adequate
?
20-Perform preliminary LOS Location
(FTP) testing. Perform 3 uploads & 3
downloads at 3 locations. Record results on
the
FTP Test Form.
D
C
E
Appendix G:
Drive Study
Form
Appendix H:
FTP Test
Form
*NOTE: Step 19 is performed
only if no RF plot is available.
21-Perform preliminary NLOS Location
(FTP) testing. Perform 3 uploads & 3
downloads at 3 locations. Record results on
the
FTP Test Form.
22-Send all preliminary test results
to Navini Technical Support
for evaluation.
24a-Adjust RF parameters &
troubleshoot. Go back to
Step 17, Perform calibration.
No
Yes
19*-Validate that the GPS & constellation
debugger are installed & operational on
the Drive Study computer. Perform
preliminary Drive Study. Record results
on the
Drive Study Form.
23-Results
adequate
?
20-Perform preliminary LOS Location
(FTP) testing. Perform 3 uploads & 3
downloads at 3 locations. Record results on
the
FTP Test Form.
D
C
E
Appendix G:
Drive Study
Form
Appendix H:
FTP Test
Form
*NOTE: Step 19 is performed
only if no RF plot is available.
21-Perform preliminary NLOS Location
(FTP) testing. Perform 3 uploads & 3
downloads at 3 locations. Record results on
the
FTP Test Form.