User's Manual

Ripwave Base Station I&C Guide Navini Networks, Inc.
28 Part #40-00047-00 Rev D v1.0
February 28, 2003
Figure 2: I&C Process Flowchart, cont’d.
Click here to link to Appendix I.
28-Verify system operation with
multiple CPE devices.
27-Send test results to
Tech Support
29-Back up the EMS database
30-Gather all required documents &
forms to create a delivery package
for the customer sign-off & for the
Navini Technical Support database.
31-Participate in customer sign-off
of
Customer Acceptance Form.
End
26-Perform full NLOS Location
(FTP) testing. Record results.
25-Perform full LOS Location
(FTP) testing. Record results.
E
Appendix I:
Customer
Acceptance
Form
24b-Perform full Drive Study, & record
results on the Drive Study Form.
This is used for tuning the model.
28-Verify system operation with
multiple CPE devices.
27-Send test results to
Tech Support
29-Back up the EMS database
30-Gather all required documents &
forms to create a delivery package
for the customer sign-off & for the
Navini Technical Support database.
31-Participate in customer sign-off
of
Customer Acceptance Form.
End
26-Perform full NLOS Location
(FTP) testing. Record results.
25-Perform full LOS Location
(FTP) testing. Record results.
E
Appendix I:
Customer
Acceptance
Form
24b-Perform full Drive Study, & record
results on the Drive Study Form.
This is used for tuning the model.