User's Manual
Table Of Contents
- Contents
- Preface
- Overview
- Installation
- Preparing for Installation
- Unpacking the Components
- Installation Guidelines
- Installing the Devices
- Connecting the Protective Ground and Power
- Wiring the Alarm Circuits
- Connecting to Device Ports
29/OCT/2014 REVIEW DRAFT — CISCO CONFIDENTIAL
2-6
Cisco IR500 Series WPAN Gateway and Range Extender Installation and Configuration Guide
Chapter 2 Installation
Unpacking the Components
WPAN Range Extender Tools and Hardware Required
The tools and hardware required for installing the WPAN range extender are:
• Crimping tool (such as Thomas & Bett part number WT2000, ERG-2001, or equivalent).
• 6-gauge copper ground wire
• Wire-stripping tools for stripping 6-gauge wire
• A number-2 Phillips screwdriver
Unpacking the Components
• WPAN Gateway Package Contents, page 2-6
• Unpacking the WPAN Gateway, page 2-6
• WPAN Range Extender Package Contents, page 2-7
• Unpacking the WPAN Range Extender, page 2-7
WPAN Gateway Package Contents
The typical WPAN gateway package contains the following items:
• WPAN gateway
• Cisco product documentation and translated safety warnings
• 4-way power and alarm connector
• Ground lug (part number 32-204389=)
• Ground screw (part number 48-1163-01=)
• Side wall mounting brackets
• Front and rear wall mounting brackets
Unpacking the WPAN Gateway
When you are unpacking the WPAN gateway, do not remove the foam blocks attached to the antenna
connectors. The foam protects the antenna connectors during installation.
To unpack the WPAN gateway, follow these steps:
Step 1 Open the shipping container and carefully remove the contents.
Step 2 Return all packing materials to the shipping container, and save it.
Step 3 Ensure that all items listed in “Package Contents” section are included in the shipment. If any item is
damaged or missing, notify your sales representative.










