User's Manual
29/OCT/2014 REVIEW DRAFT — CISCO CONFIDENTIAL
5-22
Cisco IR500 Series WPAN Gateway and Range Extender Installation and Configuration Guide
Chapter 5 Operation and Configuration
CG-NMS WPAN Device Management Related Operations
–
Mesh Route RPL Path Cost
–
Mesh Route RSSI
–
Mesh Route Reverse RSSI
• Network Routes Metrics
• Routing Path Metrics
• Raw Socket Metrics
• MAP-T Information
Uploading Firmware
Uploading of firmware to WPAN gateway and WPAN range extender devices can be performed by the
CG-NMS. You can:
• Upload ir500 firmware images to CG-NMS via the GUI.
• Execute a firmware upload to a specific group of devices.
• Perform “Set Backup” and “Schedule Reload” operations.
For more information, see the “Configuring Devices” and “Pushing Configurations to Endpoints”
sections of th
e Cisco Connected Grid Network Management System User Guide.
Creating Rules and Events
You can create rules and events for WPAN gateway and WPAN range extender devices using CG-NMS.
For more information, see the “Configuring Rules” section of the Cisc
o Connected Grid Network
Management System User Guide.










