Assembly Instructions
Navini Networks, Inc. Ripwave Base Station I&C Guide
Part #40-00047-00 Rev F v1.0 (TTA) 219
October 23, 2003
H
1
Cabinet is Positioned, Secured and Leveled Per Plan
2
Cabinet Outer Surfaces Free from scratches, dents, corrosion
3
All Hardware Connections within BTS are tightened/secured
4
RF/GPS Coax Connectors Securely Connected to BTS
5
Signal/Power Cable Securely Connected to BTS
6
Ethernet/T1 cables Dressed and Secured to BTS
7
Documents, License are Stored or Posted on BTS
J
1
RFS Antenna Height and Orientation Per Plan
2
RFS Antenna Mount Plumb Per Axis
3
GPS Antenna Mounted Per Plan
4
Zinc Cold Galvanizing compound used everywhere
5
Coaxial Cables Run Straight (Not Exceeding Bend Radius)
6
Coaxial Cables Tagged and Color Coded Per Plan
7
Connectors and Jumpers Installed and Weatherproofed
8
Cable Hangers, Bands or Ties Spaced up every 3 Feet
9
Antenna Power and Data Cable Continuity Tested
10
Antenna System Sweep Test Performed and Passed
11
SW and Hard Copy of Antenna Sweep Test Results Provided
Printed Name
Signature / Date
Company
Phone No.
Printed Name
Signature / Date
Company
Phone No.
Printed Name
Signature / Date
Company
Phone No.
BTS System
Antenna and Feeder System
NOTES
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO










