Assembly Instructions

Navini Networks, Inc. Ripwave Base Station I&C Guide
Part #40-00047-00 Rev F v1.0 (TTA) 273
October 23, 2003
_____ 12. BTS split chassis cabling
_____ 13. Ground connections to earth ground or building steel
_____ 14. Tower or mount connections to ground
Checklist
This checklist should be completed and sent to Navini Networks along with the forms and data.
Closeout Documents Completed Date File Name
1.
Customer Contact List
2. Site Candidate Evaluation Form completed
3. Drive Instructions & Map
4. Network Diagram (optional)
5. Antenna Power & Cable Selection
6. Bill of Materials
7. Excel Configuration Forms
8. RF Plot
9. Interference Data (optional)
10.
Interference Analysis Report
11.
RFS System Test Form
12.
Base Station Installation Certification Form
13.
Exported BTS Data
14.
Exported EMS Data
15.
Exported CPE Descriptor Data (optional)
16.
Base Station Calibration Verification Form
17.
Drive Study Form & Data
18.
RF Plot Tuned Model
19.
Location (FTP) Test Form
20.
RMAs
21.
Backup from EMS
Closeout Pictures Completed Date File Name
1.
RFS mounted
2. Weatherproofed connectors on RFS
3. Cable Bend radius
4. Jumper cable to RF main feeder
5. Cable ground kits if needed
6. Shelter bus bar with lightning arrestors
7. Main feeder to BTS jumpers
8. BTS Jumpers to BTS
9. RFS grounded
10.
BTS grounding at BTS/buss bar