Connection Diagram
Navini Networks, Inc. Ripwave Base Station I&C Guide
Part #40-00047-00 Rev F v1.0 (TTA) 121
October 23, 2003
Appendix C: Sample Work Breakdown Structure (WBS)
Continued on next page.....
Site Deployment Work Breakdown
Activity
Customer 3rd Party
In-House Contractor
1 System Design Criteria Established
1.1 RF Design Requirements Established
1.2 Site Configuration / BTS & RFS Requirements Established
1.3 Backhaul / T1 Requirements Established
1.4 Customer NOC / Operations Requirements Established
1.5 Network Design Requirements Established
1.6 Software Requirements Established
1.7 Hardware Requirements Established
2 Site Selection Process
2.1 Candidate Identification / Site Selection
2.2 RF Propagation / Coverage Analysis
2.3 Interference Analysis / Intermod Study
2.4 Drive Test / Coverage Verification
2.5 Site Survey / Constructability Review
2.6 Zoning Analysis
2.7 FAA / FCC / ASAC Compliance Reviews / Submittals
3 Site Acquisition and Leasing
3.1 Master License Agreements
3.2 Site License Agreements
3.3 Lease and Exhibit B Development Work
3.4 Rents and Payments
3.5 Entry and Testing Agreements
3.6 Phase 1 Environmental Screen
3.7 NEPA Checklist
3.8 State Historical Preservation Organization Review
4 Site Design and Development
4.1 Design Coordination / Site Design Walks
4.2 A&E Drawing Package Development
4.3 Site Survey - 2C
4.4 Soils Report
4.5 Tower / Foundation Design
4.6 Structural Analysis
4.7 Permit and Const Drawing Package Review and Approval
4.8 Zoning Permits
4.9 Construction Permits - Building & Electrical
Navini Networks
Responsibility
Item No.
5 Material Procurement
5.1 Bill Of Materials From Approved Construction Drawings
5.2 Vendor Selection
5.3 Bids / Quotes
5.4 Requisitions / Purchase Orders
5.5 Tower, Mounts, Lightning Protection, Lighting, Cable Ladder, Safety Climb,.
5.6 BTS - with Rack (IBTS), with Enclosure (OBTS)
5.7 RFS - Active, Passive
5.8 Cables, Connectors, Mounting Hardware, Surge Protection
5.9 AC Power Equipment
5.10 DC Power Equipment
5.11 Telco Equipment
5.12 Grounding Equipment and Materials
5.13 Delivery Coordination / Warehousing / Logistics
6 Facilities Orders
6.1 Electric Power Service Order Site Walk / Engineering
6.2 Electric Power Service / Equipment Order
6.3 Telephone Service Order Site Walk / Engineering
6.4 Telco Service / Equipment Order










