Appendix B: Sample Responsibility Assignment Matrix
(RAM)
The following is an example of a Responsibility Assignment Matrix (RAM). The RAM is a tool for
capturing who will do what to get systems deployed and turned up. It provides an easy-to-read and
follow tabular format. Each of the activities in the list must be addressed in order to complete the
installation and commissioning tasks for a Ripwave Base Station.
1 = Primary Responsibility S = Supply
2 = Secondary Responsibility I = Install
Item #
Task / Activity Navini Client Other Notes
MARKET PLANNING and RF ENGINEERING
1 Develop coverage objectives 1
2 Provide Hardware Specifications 1
3 Provide Link Budget 1
4 Prepare Preliminary Coverage Plots 2 1
5 Interference Analysis / Noise Floor 2 1
6 Link Specific Channel Assignments 2 1
7 Review / Approve RF Design 2 1
8 SCT Filing fees 1
9 SCT licensing / clearing 1
10 Contract RF consulting engineering 1
11 Obtain SCT Test Permit 1
NETWORK ENGINEERING & BACKHAUL
1 Network Requirements 2 1
2 Network Architecture 2 1
3 Provisioning Guidelines 1