Installation Instructions Chapter 1
Navini Networks, Inc. Ripwave Base Station I&C Guide
Chapter 1
Part #40-00047-01 Rev F v1.0 (TTA) 25
October 23, 2003
Phase I: Pre-installation -
Site Selection, Design & Preparation, continued
6
-
Complete the Network Architecture design.
<Network Planning>
8
-
Develop a Bill of Materials (
BoM
).
<Customer >
9 - Acquire the materials. <Customer>
10
-
Confirm the customer backhaul, EMS
Server, FTP Server, input power and
grounding are installed and operational at site.
Appendix M:
Sample BoM
7 - Antenna Power & Cable selection.
A
Appendix L:
Antenna Power & Cable
Selection Procedure &
Form










