Installation Instructions Chapter 1

Ripwave Base Station I&C Guide Navini Networks, Inc.
Chapter 1
26 Part #40-00047-01 Rev F v1.0 (TTA)
October 23, 2003
Phase II: Installation
1
-
From the shipping containers received at
the customer site, gather Manufacturing’s
inventory sheet and test data that was collected
before the BTS & RFS equipment shipped.
Verify all equipment arrived (inventory it),
serial numbers match paperwork, and the test
data is available. Keep this as part of the
customer site records.
2
-
Install all system buss bars and surge
protectors.
4
-
Instal
l & sweep the RF cables. Record
results on the RFS System Test Form.
5 - Install & sweep the GPS cables.
6 - Test & install the data/power cable.
7 - If required, install the BTS mounting rack.
8 - Install the BTS chassis.
Appendix O:
RFS System
Test
Appendix Q:
Sample Tri-sector
BTS Grounding
Drawing
9 - Install & verify the BTS & RFS grounding.
A
3 - Cut cables. Install connectors on cables.
Appendix N:
Install Connectors
Appendix P:
Chassis Alarms
Information