Installation Instructions Chapter 1
Navini Networks, Inc. Ripwave Base Station I&C Guide
Chapter 1
Part #40-00047-01 Rev F v1.0 (TTA) 29
October 23, 2003
Phase III: Commissioning
1
-
Review the customer’s network plans
-
i.e.,
T1 vs Ethernet backhaul.
3b
-
Install &
configure
the customer EMS
Server & Client. Connect to the BTS.
4
-
Enter the RFS configuration by running the
RFS script that shipped with the antenna
equipment.
2
-
Are you using
the customer’s
EMS Server?
No
Yes
3a
-
Install &
configure
the
Test EMS Server & Client.
Connect to the BTS.
Appendix U:
Excel Configuration
Form
5 - Verify that all cables are connected.
6
-
Power up the BTS & reconfigure the basic
Boot Line parameters through the serial port
on the CC card.
7
-
After the B
TS has been powered up at least
15 minutes, perform 3 calibrations.
A










