Installation Instructions Chapter 1
Ripwave Base Station I&C Guide Navini Networks, Inc.
Chapter 1
30 Part #40-00047-01 Rev F v1.0 (TTA)
October 23, 2003
Phase III: Commissioning, continued
9b
-
Perform Base Station calibration. Verify
and record the measurements on the Base
Station Calibration Verification Form.
8
-
Did it pass
calibration?
No
Yes
9a
-
Perform sys
tem
troubleshooting procedures.
Appendix V:
Base Station
Calibration
Verification Form
11b
-
Perform local wired Modem test.
B
A
10
-
Did it pass
calibration
verification?
No
Yes
11a
-
Perform system
troubleshooting procedures.
12
-
Did it pass
the wired
Modem test?
No - Go to 11a
Yes
Appendix W:
Local Modem Test
Procedures










