Installation Instructions Chapter 1
Navini Networks, Inc. Ripwave Base Station I&C Guide
Chapter 1
Part #40-00047-01 Rev F v1.0 (TTA) 31
October 23, 2003
Phase III: Commissioning, continued
14
-
Did it pass
the OTA
Modem test?
Yes
13
-
Perform the local over
-
the-air (OTA) Modem test.
16
-
Install & confi
gure the Customer EMS
Server & Client. Connect to the BTS.
D
B
No
Yes
15
-
Was the
Test EMS
used?
No - Go to 11a
C
17
-
Verify the EMS Server & BTS
connectivity.
18
-
Perform calibration. Ensure successful
results 3 times.










