Installation Instructions Chapter 1
Navini Networks, Inc. Ripwave Base Station I&C Guide
Chapter 1
Part #40-00047-01 Rev F v1.0 (TTA) 33
October 23, 2003
Phase III: Commissioning, continued
24b
-
Perform full Drive Study, and
record the results on the Drive Study
Form. This is used for tuning the
model (same form as Step 19,
Appendix X).
25
-
Perform full LOS Location (FTP) Test.
Record the results (same form as Step 20,
Appendix Y).
E
27
-
Send test results to Navini Technical
Support.
Appendix Z:
Site Installation
Closeout
Documentation
26
-
Pe
rform full NLOS Location (FTP) Test.
Record the results (same form as Step 20,
Appendix Y).
28
-
Verify system operation with multiple
Modems in use.
29 - Back up the EMS database.
30
-
Gather all required documents & forms to
create a delivery package for the Customer sign-
off and for the Navini Techical Support database.
See Installation Closeout Documentation.
31
-
Participate in the Customer sign
-
off of the
Customer Acceptance Form.
Appendix AA:
Customer
Acceptance Form










