Installation Instructions Chapter 1

Navini Networks, Inc. Ripwave Base Station I&C Guide
Chapter 1
Part #40-00047-01 Rev F v1.0 (TTA) 5
October 23, 2003
TABLE OF CONTENTS
About This Document 2
Permissions, Trademarks & Distribution 4
Table of Contents 5
Safety 6
Regulatory Information 7
Battery Caution & Procedures 10
Glossary of Terms & Abbreviations 11
CHAPTER 1: OVERVIEW 20
RIPWAVE DESCRIPTION 21
PROCEDURAL DOCUMENTS & FORMS 23
HIGH-LEVEL I&C PROCESS FLOWCHART 23
BASE STATION COMPONENTS 34
TECHNICAL SPECIFICATIONS 38
BTS INPUT/OUTPUT SPECIFICATIONS 39
CHAPTER 2: INSTALLATION 41
PRE-INSTALLATION 41
INSTALL POWER & GROUNDING 45
INSTALL CABLES 48
INSTALL THE BTS 55
INSTALL GPS ANTENNAS 60
INSTALL THE RFS 61
VERIFY INSTALLED CIRCUIT CARDS 73
BASE STATION INSTALLATION CERTIFICATION 74
CHAPTER 3: COMMISSIONING 75
REVIEW CUSTOMER NETWORK PLANS 75
INSTALL EMS SERVER 75
VERIFY CABLE CONNECTIONS 76
CONFIGURE & POWER UP THE BTS 77
CALIBRATE THE BASE STATION 100
PERFORM THE CALIBRATION VERIFICATION PROCEDURE 104
SINGLE ANTENNA TEST 104
EXPORT BTS DATA 104
PERFORM LOCAL MODEM TESTS 104
INSTALL & TEST CUSTOMER EMS OPERATIONS 105
PERFORM CALIBRATION USING CUSTOMER’S EMS 106
VERIFY SYSTEM PERFORMANCE 106
VERIFY SYSTEM OPERATION WITH MULTIPLE MODEMS 107
BACK UP EMS DATABASE 107
CUSTOMER ACCEPTANCE 107