Installation Instructions Chapter 1

Ripwave Base Station I&C Guide Navini Networks, Inc.
Chapter 1
6 Part #40-00047-01 Rev F v1.0 (TTA)
October 23, 2003
APPENDICES
A: SAMPLE STATEMENT OF WORK (SOW) 109
B: SAMPLE RESPONSIBILITY ASSIGNMENT MATRIX (RAM) 113
C: SAMPLE WORK BREAKDOWN STRUCTURE (WBS) 121
D: SITE CANDIDATE EVALUATION FORM 123
E: INTERFERENCE SWEEP PROCEDURE 135
F: INTERFERENCE SWEEP TOOL 141
G: BTS SPECIFICATIONS 147
H: RFS DATA SHEETS 155
I: BTS OUTDOOR ENCLOSURES GUIDE 159
J: RECTIFIER/BATTERY BACKUP SPECIFICATIONS 161
K: SAMPLE BASE STATION DRAWING 163
L: ANTENNA POWER & CABLE SELECTION PROCEDURE & FORM 165
M: SAMPLE BILL OF MATERIALS 171
N: INSTALL CONNECTORS ON CABLES PROCEDURE 175
O: RFS SYSTEM TEST (CABLE SWEEP) 181
P: BTS CHASSIS ALARMS 203
Q: SAMPLE TRI-SECTORED BTS GROUNDING DRAWING 205
R: SAMPLE TRI-SECTORED BTS POWER DRAWING 207
S: SINGLE ANTENNA TEST PROCEDURE 209
T: BASE STATION INSTALLATION CERTIFICATION FORM 217
U: EXCEL CONFIGURATION FORM 221
V: BASE STATION CALIBRATION VERIFICATION PROCEDURE & FORM 243
W: LOCAL MODEM TEST PROCEDURES 251
X: DRIVE STUDY PROCEDURE & FORM 257
Y: LOCATION (FTP) TEST PROCEDURE & FORM 263
Z: SITE INSTALLATION CLOSE-OUT DOCUMENTATION 271
AA: CUSTOMER ACCEPTANCE FORM 275